Balconies and fire: what changed

In England, balconies on tall residential buildings must now be built from non-combustible materials. This guide explains regulation 7(2), the 11 m guidance in Approved Document B, and what it means when a balcony is replaced.

Balconies and fire: what changed

What the regulation says

Regulation 7(2) of the Building Regulations 2010 says that building work must be carried out so that materials which become part of an external wall, or a specified attachment, of a relevant building are of European Classification A2-s1, d0 or A1. A relevant building is one with a storey at least 18 metres above ground level that contains one or more dwellings, an institution, or a room for residential purposes. The height is measured from the lowest ground level adjoining the outside of the building to the top of the floor surface of the storey.

The balcony does not have to be 18 m up. If the building has a storey at that height, balconies on it fall under the rule. This version is for England. Wales has its own regulation.

A storey does not include a roof-top plant area or a storey made up only of plant rooms. That is why the height of the storey, not the top of the building, is what counts. Ask your building control body to confirm which storey height applies to your block.

Balcony fire rules, England
TestApplies toRequirement
Regulation 7(2)Relevant building: storey at least 18 m above ground, with dwellings, an institution or a room for residential purposesExternal wall and specified attachment materials A2-s1, d0 or A1
AD B paragraph 10.10Residential buildings with a storey 11 m or moreBalcony materials A1 or A2-s1, d0, or an imperforate soffit with at least 30 minutes' fire resistance
Exemption, floor layerTop horizontal floor layer of a balconyA1fl or A2fl-s1 with an imperforate substrate under the entire layer

Swipe the table sideways to see every column.

Specified attachments and balconies

Regulation 7(2) was substituted for England from 1 December 2022 by S.I. 2022/603, and balconies were brought into the rule at that point as specified attachments. Approved Document B defines a specified attachment in its appendix as a balcony attached to an external wall, solar shading or a solar panel. A balcony frame, deck, soffit and balustrade are therefore all part of the test. It applies to new work, which includes replacing parts of an existing balcony.

The regulation governs building work, so it bites when you replace or alter a balcony. A repair that swaps one material for another is building work in the same way. What must come off an existing balcony, and when, is a separate question for the building owner, the fire consultant and in some cases the Building Safety Regulator.

Guidance from 11 metres

Paragraph 10.10 of Approved Document B volume 1 (dwellings) goes further than the law. For buildings with a residential purpose and a storey of 11 m or more, balconies should meet either of two conditions. The first is that they contain only materials of class A1 or A2-s1, d0, with listed exceptions. The second is an imperforate soffit over the whole balcony area, of at least 30 minutes' fire resistance and made of A2-s1, d0 material or better, with a band of non-combustible material where combustible material crosses a compartment line.

Where regulation 7(2) applies it prevails over the guidance. Between 11 m and 18 m the guidance is a route the building control body expects, not a legal minimum, and a fire engineer may propose another.

What the rules let through

Regulation 7(3) lists exemptions. They include membranes, seals, gaskets, fixings, sealants, cavity trays, fire stopping, thermal breaks where Part L needs them, and electrical installations. The top horizontal floor layer of a balcony is also exempt if it is of class A1fl or A2fl-s1 and the entire layer has an imperforate substrate under it. This is why an aluminium deck board on a non-combustible frame is common on replacements.

Timber and many composite decking boards fail the rule. Timber soffits and timber balustrade posts fail as well. A supplier should provide a test classification for each part, not a desk assessment.

What it means for a replacement balcony

A steel frame is non-combustible. A bolt-on steel balcony with an aluminium deck, aluminium or fibre-cement soffits and steel or aluminium balustrade meets the material rule if each part has the classification evidence. Decide the materials before the drawings are issued, because the sizes of boards, soffit panels and fixings depend on the system chosen.

Laminated glass in the balustrade is not settled for buildings over 18 m. Check with building control before you specify it. An existing higher-risk building may also need approval from the Building Safety Regulator before the work starts. We cannot give that advice. Ask your building control body or your fire consultant.

If your block has no storey at 11 m, paragraph 10.10 does not apply to it in the same way. The lease, the insurer or the building owner may still ask for non-combustible parts, so check before you choose.

What we draw

We draw the balcony from the design you give us and the survey of what is there. The set includes the frame, the fixings, the deck and soffit layout, the balustrade and the material of each part, with a list that your fire consultant can check. We do not assess the fire performance of any product.

Keep the evidence file with the drawings. Test certificates, classification reports and data sheets for each product should be traceable to the part numbers on the schedule. A building control body or a later buyer may ask for them years afterwards, and a clear schedule saves a long search.

Questions

What is regulation 7(2)?

A rule in the Building Regulations 2010 that requires materials in the external wall, or a specified attachment such as a balcony, of a relevant building to be class A2-s1, d0 or A1.

Which buildings does it apply to?

Buildings with a storey at least 18 metres above ground level that contain one or more dwellings, an institution or a room for residential purposes.

Does it apply to a balcony I replace?

Yes. It applies to building work, so new materials on a balcony in a relevant building must meet it.

Is timber decking allowed?

Not as the structure or finish on a relevant building. Only the top floor layer is exempt, and only if it is A1fl or A2fl-s1 with an imperforate substrate beneath it.

What about balconies between 11 m and 18 m?

Approved Document B paragraph 10.10 gives two ways to comply. It is guidance rather than law, but building control expects it to be met.

Can you tell me if my balcony complies?

No. We draw the balcony from your design. A fire consultant or your building control body assesses compliance.

Sources

Read on the published page. These guides are for England unless they say otherwise, and explain the documents: your council, building control body and engineer decide your job.

  1. The Building Regulations 2010, regulation 7 (England), reg 7(2)“are of European Classification A2-s1, d0 or A1”
  2. The Building Regulations 2010, regulation 7 (England), reg 7(4)(a)“at least 18 metres above ground level”
  3. The Building Regulations 2010, regulation 7 (England), reg 7(3)(k)“A1fl or A2fl-s1”
  4. Approved Document B Volume 1: Dwellings, 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments, para 10.10, p.82“balconies should meet either of the following conditions”