Trade/Structural steelwork
Structural steelwork types.
Portal frame buildings, distribution centres, footbridges, and the erection, lift and load plans that get steel up: drawn from one model, from the GA to the wagon.

Structural steelwork types

Portal frame buildings
Portal frame warehouses and sheds: frames, bracing, purlins, cladding and docks.
Trade from £895portal frame building, fixed price

Footbridges
Truss footbridges over railways and roads, with their approaches.
Trade from £895portal frame building, fixed price

Load plans
Every wagon of steel planned: what goes on, in what order, and how it is secured.
Trade from £895portal frame building, fixed price

Erection and lift plans
Erection stages and lift plans with sling legs, loads and hook heights.
Trade from £895portal frame building, fixed price

Catwalks and platforms
Handrail-truss catwalks, peak platforms and hop-over stairs over pipework.
Trade from £895portal frame building, fixed price

Mezzanine floors
Steel mezzanine floors inside sheds and warehouses: columns, beams, deck, stairs and guarding.
Trade from £895portal frame building, fixed price
Side by side
Cost bands are our own relative view of drawing effort, not quotes.
| Type | What it is drawn from | What the other trades get | Who decides the content | Relative cost |
|---|---|---|---|---|
| Portal frame buildings | The engineer's member sizes and connection forces | Marked assembly sheets, plates with DXFs, cut and bolt lists, NC files | Your engineer designs; we draw | £££ |
| Footbridges | The engineer's truss design and the railway owner's requirements | Segment sheets, splices, bearings, trial erection and lift sheets | Engineer and railway owner approve; we draw | £££ |
| Load plans | The marked model and your haulier's trailers | A drawing of each wagon, axle loads, chaining, a loading list | The haulier owns the final scheme | £ |
| Erection and lift plans | The marked model and the site access | Erection stages, a lift list and worst-case lift sheets | The appointed person owns the lift plan | ££ |
| Catwalks and platforms | The engineer's sizes, the plant layout and the access routes | Truss and stair assemblies, connections, plates with DXFs, lists | Your engineer designs; we draw | ££ |
| Mezzanine floors | The engineer's grid, sizes and floor load, inside the building's frame | Column and beam sheets, deck layout, guarding and pallet gate, base set-out | Your engineer designs; we draw | ££ |
Swipe the table sideways to see every column.
How to choose
Structural steel is drawn from the engineer’s design: we model every member, plate and bolt, check that every bolt passes through matching holes in every ply and every fitting touches what it is welded to, then take the GAs, the assembly sheets, the plates and the shop files off that one model.
The same model plans the site: the erection sequence in stable stages, the lifts with their sling legs, and the loads on each wagon in the order the steel goes up.
Pick by the question you need answered. If a fabricator needs to make the steel, you want the portal frame or footbridge set: assemblies, plates, lists and files. If a haulier or a site manager asks how it gets there and goes up, you want the load plans and the erection and lift plans. They all come from the same marked model, so changes to the steel carry through to every list and sheet, and a late change does not leave one drawing out of step.
Our part is the drawing, not the design. Your engineer designs the frame or the bridge and tells us the sizes and the forces. For a footbridge over a railway the owner approves the design, so the parapet and clearances follow their standard, not ours. For lifts, BCSA 47/09 says the appointed person is responsible for the safe system of work, so our sheets supply weights, positions and sequence and leave the crane, ground and sling ratings to that person. Likewise the haulier decides how a load is secured.
Price follows tonnage and the number of different marks, not just size. A building of repeated frames is cheaper to draw than a smaller one with every beam different. To start, send the engineer's drawings or calculations summary, the marked steel list if there is one, the site access, the crane position if known, and the programme. The fabricator's own preferences (their drawing style, their NC file format) are worth sending too, because we can match them.
What the drawings show
- GA sets: foundations and holding-down bolts, plans, elevations and frames
- An assembly sheet per mark, plates with DXFs, NC1 files for the saw and drill line
- Erection stages, lift plans and wagon load plans
- Cut lists, material lists and bolt schedules
Questions
Do you design the steel frame?
No. We are a drawing office. Your engineer designs the frame and tells us the sizes, the loads and the connection forces. We model every member, plate and bolt to that design and check the geometry, the holes and the clashes.
Can you produce NC files for a frame?
Yes. We write DSTV NC1 files for I sections, channels and tubes, and DXF for plates. They have not yet been run on a fabricator's machine, so please check one on yours before the first job.
Who is responsible for the lifting plan?
The appointed person, under BS 7121 and the Lifting Operations and Lifting Equipment Regulations. Our drawings give the appointed person the weights and sequence from the model; they do not replace the plan.
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.