Balcony replacement and remediation

Old bolt-on balconies surveyed one by one, graded, and replaced or repaired to today’s fire rules, with every balcony’s own sizes on its sheet.

Balcony replacement and remediation

3D modelFrom sample project WC13, rendered from the model.

What it is

No two old balconies are quite the same size. We model the survey of each, grade the frames as sound, to repair or to replace, and group the new ones into types so most are made to standard sizes and the rest made to measure.

Timber decks and soffits come out; the new balconies are non-combustible where the building’s height needs it.

Sizes and options

As we draw it. Every size is set to your job.

SurveyEach balcony modelled from its measurements
GradingSound, repair or replace
TypesStandard and made-to-measure groups

Worth knowing

A new aluminium deck is only exempt if there is a solid layer under it.

Approved Document B lets the top floor layer of a balcony be class A1fl or A2fl-s1 only when it has an imperforate substrate beneath it that extends to the full size of that layer. Boards laid at open gaps over joists have nothing under them, so the decking has to meet the wall classification too: the fire engineer decides.

Source: Approved Document B Volume 1, 2019 edition incl. 2026 amendments, paragraph 10.10a(vi)

The detail

How it is made, fitted and priced, and what to tell us.

The work starts with a survey of every balcony, because no two are the same. We model each one from its measurements: width and projection, the level of the frame against the design, the fall front to back and the diagonal difference. Our planning tolerances are 5 mm for standard parts and 25 mm for made-to-measure; the joist packers take up a frame level from 12 mm low to 8 mm high, and anything outside that is flagged, not averaged away. Every balcony is one line in the register. The engineer and the system supplier confirm the tolerances.

The frame is graded: A sound (clean and touch up), B repair (wire brush, zinc-rich repair and new bolts) or C replace. That grade drives the price more than anything else, and it can only be set by looking at the steel once the old decking is off, so the first pass is an allowance and the second is firm. New decks are set to the door threshold, whatever the frame is doing underneath.

The fire rule is why the job exists. On residential buildings with a storey 11 m or more up, Approved Document B asks for non-combustible balconies, and from 18 m regulation 7(2) applies to new work. A desk assessment does not prove compliance with 7(2); the decking, soffit and balustrade parts need a test classification. Laminated glass in balustrades above 18 m is still unresolved, so we draw steel bars unless you tell us otherwise.

Existing buildings of seven storeys or 18 m with two or more homes are higher-risk buildings, and the building safety regulator's approval is needed before work starts. That is the client's application; we supply the drawing schedule and the drawings it needs. Residents are usually in occupation throughout, so the sequence by stack matters. Send us what you have: the survey, the fire engineer's report, the existing drawings and photographs of every elevation.

More views

Renders and sheets from our sample projects: made-up jobs, modelled and drawn the way a real one is.

Balcony replacement - view 1, rendered from the 3D model
3D renderSample project WC13
Balcony replacement - view 2, rendered from the 3D model
3D renderSample project WC13

Is it right for you?

Good for

  • Blocks of flats with timber or mixed balconies
  • Building safety remediation

Not for

  • One balcony with a worn deck: a builder can fix that without drawings
  • A building where the fire engineer has not yet set the scope: that comes first

What the drawings show

  • A survey register with one line per balcony: measured sizes, level, fall, squareness and frame grade
  • Type marks that group balconies into standard sizes and made-to-measure sizes, with the packers each one needs
  • Before and after elevations of each stack, with the removed parts shown
  • The new deck, soffit and fascia build-up in section, with the non-combustible classes noted
  • An installation sequence by stack, with the scaffold and crane positions

Questions

Guide: Balconies and fire: what changedGuide: How to measure for a Juliet balconyGuide: How to measure for a bolt-on balcony

Do balconies on tall flats have to be replaced?

Not all of them. The rules apply by building height and use. On residential buildings with a storey 11 m or more up, Approved Document B asks balconies to be non-combustible or to have a fire-resisting soffit; from 18 m regulation 7(2) applies to new work. Whether existing balconies must change depends on a fire engineer's appraisal.

Can the existing steel frame be kept?

Often, where it is sound. We grade each frame A, B or C. A and B are cleaned and repaired and keep their frame; C is replaced. The decking and soffit are usually timber or composite and come out either way. A structural check of the fixings back to the building is needed.

Does the Building Safety Regulator get involved?

For existing higher-risk buildings, which are seven storeys or 18 m with two or more residential units, building work needs the regulator's approval before it starts. The client or principal designer applies. We supply drawings in the form the application needs.

How long does it take per balcony?

We found no published figure, so we will not invent one. It depends on the survey, the frame grade and the access. The sequence by stack goes on the installation drawing, and the contractor's programme sets the days. Residents are usually in occupation throughout, which slows the work.

What does a survey need to include?

Width and projection, the frame level against the floor inside, the front-to-back fall, the diagonals and the condition of the steel and bolts, with photographs. Every door has to be opened, so a site visit with someone who has the keys saves a second trip.

Send the drawings.

Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).

Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.

Big files: paste a WeTransfer, Dropbox or Google Drive link, or send them when we reply.

Thanks, that’s with us.

We use your details only to answer you: privacy, terms.