Guides/Farm buildings: planning and building regs
Farm buildings: prior approval, planning and building regulations
A farm building in England may not need a planning application, but it usually needs the council's prior approval, and the land has to be farmed as a trade or business. This guide sets out the limits in Part 6 of the permitted development order and the Building Regulations exemption for agricultural buildings.

Prior approval is not planning permission
Part 6 of Schedule 2 to the General Permitted Development Order 2015 gives farms a right to build and extend agricultural buildings without a full planning application. It does not mean nothing needs doing. For most new buildings the council can require its prior approval of siting, design and appearance. After you send the application, the council has 28 days to say that approval is needed. If it says nothing in that time, the work may go ahead.
The rights differ by the size of the farm. They also differ with the council's reading, so a call or an email before you spend money on drawings is worth the time.
| Item | Class A (5 ha or more) | Class B (0.4 to under 5 ha) |
|---|---|---|
| Works allowed | New buildings, extensions, alterations | Extension or alteration of an existing agricultural building |
| Maximum height | 12 m (3 m within 3 km of an aerodrome) | See the order |
| Area limit | 1,500 m2 of buildings; 1,000 m2 livestock or plant works | 1,250 m2 for an extended building; 25% increase in cubic content |
| Roads | Not within 25 m of a trunk or classified road | Not within 25 m of a trunk or classified road |
| Livestock buildings | Not within 400 m of a protected building | See the order |
| Prior approval timing | Council has 28 days to respond | See the order |
Swipe the table sideways to see every column.
Class A: agricultural units of 5 hectares or more
Class A applies to an agricultural unit of 5 hectares or more. The main limits are these. The building must not be on a separate parcel of less than 1 hectare. Works for accommodating livestock or plant must not exceed 1,000 square metres, and the buildings erected or extended under the class must not exceed 1,500 square metres in total. The height must not exceed 12 metres, or 3 metres if it is within 3 km of an aerodrome.
A building cannot be within 25 metres of a metalled part of a trunk road or classified road. A livestock building cannot be within 400 metres of the curtilage of a protected building, such as a house that is not part of the farm. The 400 m rule is the one that stops many livestock sheds, so measure it on a map before you design.
Class B: units from 0.4 to under 5 hectares
Class B covers units of not less than 0.4 but less than 5 hectares. It is much narrower. It is aimed at extending or altering an existing agricultural building, and any new building has to sit close to the original, so read the order for the distance. The cubic content of the original building must not increase by more than 25%, and the ground area of a building extended under the class must not exceed 1,250 square metres. The 25 metre road limit applies here too.
If you have a small holding and want a new building, you will probably need a planning application. Put the farm plan and the reason for the building in with it.
Trade or business: the test that catches hobby farms
Both classes depend on the land being agricultural land, which the order defines as land in use for agriculture and so used for the purposes of a trade or business. A dwellinghouse or its garden is not agricultural land. A smallholder who keeps a few horses or sheep for pleasure may not meet the test. The council decides.
If you are not sure, ask the council before you order drawings or steel. Keep records such as accounts, a holding number or sales that show a business.
Councils often ask for the evidence in writing. A short statement of what the building is for, how many animals or how much crop it serves, and how the holding is run, makes the application easier to read.
Building Regulations for agricultural buildings
Schedule 2 of the Building Regulations 2010 exempts agricultural buildings in Class 3. The conditions are that no part of the building is used as a dwelling, no point of it is less than one and a half times its height from any building which contains sleeping accommodation, and it has a fire exit not more than 30 metres from any point in the building. The exemption does not apply if the principal purpose is retailing, packing or exhibiting.
The exemption removes the approval, not the load. Wind and snow still act on the building, and a poorly braced shed can fail. We draw the portal frames, the purlins, the bracing and the base details from your engineer's design, and we check clashes and fit on the model. We do not size the steel or the foundations.
What we draw for a farm building
A farm building pack from us has a site plan with the distances to boundaries and roads, a frame layout, elevations with the bays marked, a cladding layout and a list of the steel and fixings. Planning drawings are a different set. If the council wants them, we draw plans and elevations to the scale it asks for.
Send us the field or yard dimensions, the height you need under the eaves, the doors, and the stock or machinery that will use the building.
We also mark gutters, downpipes and drainage runs, the apron outside the doors and any lean-to or future extension bay. Adding a bay later costs far less if the frame and the foundations were drawn for it from the start. A hay barn, a livestock shed and a workshop are different buildings, even if they look similar from the road.
Questions
Do I need planning permission for a farm building?
Often not, under Part 6 of the GPDO 2015, but you usually need the council's prior approval of siting, design and appearance, and the land must be farmed for a trade or business. Smaller units have fewer rights. Check with your council.
How big can an agricultural building be without planning?
On a unit of 5 hectares or more: up to 12 m high and 1,500 m2 of buildings under Class A, with 1,000 m2 as the limit for livestock works. Units of 0.4 to under 5 hectares can only extend existing buildings, by up to 25% in cubic content.
How close to a house can a livestock building be?
Not within 400 metres of the curtilage of a protected building under Class A. Measure it before you design.
Do farm buildings need building regulations approval?
Not if they meet the conditions for exemption in Class 3 of Schedule 2: no dwelling use, 1.5 times the building height from sleeping accommodation, and a fire exit within 30 m. Principal retail, packing or exhibiting use takes the building outside it.
Does the 28-day rule mean I can start work?
If the council has not responded to your application in 28 days, development may go ahead under the terms you submitted. Do not start without checking the council's decision on the application.
Can a horse owner use these rights?
Only if the land is used for agriculture for the purposes of a trade or business. A private horse field often is not. Ask your council.
Sources
Read on the published page. These guides are for England unless they say otherwise, and explain the documents: your council, building control body and engineer decide your job.
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Class A preamble“agricultural unit of 5 hectares or more in area”
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Class A, A.1(g)“would exceed 12 metres”
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Class A, A.1(i)“within 400 metres of the curtilage of a protected building”
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Class B, B.2(b)“the cubic content of the original building would be increased by more than 25%”
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Interpretation D.1“so used for the purposes of a trade or business”
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 6, Class A, A.2(2)(iii)“within 28 days following the date of receiving the applicant's application”
- The Building Regulations 2010, Schedule 2 (exempt buildings and work), Class 3“no part of the building is used as a dwelling”
Where next

Farm buildings
Livestock sheds, barns, grain and straw stores, garages and workshops.
From £495back in 5 working days

Farm buildings
Livestock, lambing and cubicle sheds, grain and straw stores, and workshops, each a steel portal frame drawn with its foundations, roof, walls and order list.
6 typessee them all
More guides

Balustrade heights in the UK
Balustrade height rules for England: 900 mm on stairs, 1100 mm on external balconies in houses, and the 100 mm sphere test for every gap and opening.
Guide5 sources read

Juliet balcony rules in England
Juliet balcony rules for England: a guard at least 1100 mm high, a 100 mm sphere test, no platform to stand on and fixings that suit the wall.
Guide5 sources read

Do you need planning for a carport or canopy?
Planning for a carport, canopy or pergola in England: a porch is limited to 3 m2, and an outbuilding to 2.5 m high within 2 m of a boundary.
Guide6 sources read