Homes and gardens/Canopies, pergolas and carports/Solar carport
Solar carports and EV hubs
Steel canopies over parking bays carrying solar panels, with EV chargers at the columns and the foundations set out to the bays.

3D modelFrom sample project AF09, rendered from the model.
What it is
A solar carport is a canopy designed round the panels: rafters at the panel clamp lines, purlins at their quarter points, and a gutter in the valley. The columns are set out between bays so no door hits them.
Our sample is three canopies and an EV hub: 84 bays, 219 kWp.
Sizes and options
As we draw it. Every size is set to your job.
| Sample | 84 bays, 20 EV, 219 kWp |
| Frame | UC columns, UB rafters, Z purlins |
| Roof | Glass-glass solar modules |
Worth knowing
Four metres high, ten metres from a house.
A solar canopy over a non-domestic car park is permitted development only if no part is over 4 m high and it is more than 10 m from the curtilage of a dwellinghouse or block of flats. It also needs the council's prior approval, including for glare on neighbours.
The detail
How it is made, fitted and priced, and what to tell us.
A solar carport is a canopy designed around the panels. Our sample uses a 72-cell glass-glass module 2278 x 1134 x 30, clamped on its long sides, and the rafters sit at the clamp lines a quarter of the module length in from each end (570 from the short edges). The purlins are cold-rolled Z sections on the rafters, and a valley gutter between two sloping roofs takes the rain. The columns are set between bays so no car door hits them. Change the module and the clamp lines move, which moves every rafter, so the module is chosen first.
Wind sizes the columns and bases. Our rules file holds the canopy roof pressure coefficients from BS EN 1991-1-4 clause 7.3 (secondary, as reproduced there), where a roof at 5 degrees sees suction of 0.6 to 1.4 times the wind pressure depending on blockage by the cars beneath. So a solar carport needs a column fixed at the foot, usually a UC on a stiffened base plate, with a concrete pad the engineer sizes for overturning. Snow is checked to the site's altitude. All of that is for your engineer; we set the steel out and check clearances and clashes.
Planning is the first gate. For a solar canopy on a non-domestic off-street car park, the permitted-development route is Class OA of Part 14: no part higher than 4 m and not within 10 m of the curtilage of a dwelling or block of flats, with prior approval from the council on siting, design and appearance, including glare. Anywhere over those limits needs a full application. Our sample tops out at 3.84 m, so it fits the height. Note also the Class OA does not apply within a dwellinghouse's own curtilage.
EV charging is the other half. Charge points have set heights (socket 800 to 950, controls 800 to 1200, from PAS 1899), a clear 1200 in front, and accessible bays need wider zones. Where a car park has more than 10 spaces, new non-residential work needs at least one charge point and cable routes to a fifth of the rest (Approved Document S). We draw the charger positions, the bollards and the bays together. Tell us the bay count, the layout of the car park, the module you prefer, the grid connection and who owns the chargers.
Is it right for you?
Good for
- Business parks and car parks
- EV charging hubs
Not for
- A canopy within 10 m of a house or flats: Class OA does not apply
- A car park where the grid connection has not been checked
What the drawings show
- Site plan with bay layout, columns between bays, aisle widths and the accessible bays with their transfer zones
- Roof plan with rafters at the module clamp lines, purlins, and the valley gutter and downpipes
- Section through a frame showing the column, rafter, haunch connection and the clear height
- Foundation and holding-down bolt plan with a base schedule and set-out from the first column
- Charger island plan and elevation with PAS 1899 heights and bollards
- Panel and charging schedule
Do solar carports need planning permission?
On a non-domestic car park, the permitted-development route (Class OA) needs prior approval from the council, and the canopy must be no higher than 4 m and not within 10 m of a dwelling or block of flats. Taller or closer needs a full application. At a house the rules are different.
How high is a solar carport?
Tall enough for the cars and the clear height you need under it. Our sample is 3835 to the top with 2944 clear underneath. Accessible bays need 2600 clear. Class OA caps the height at 4 m for the permitted-development route, so the top is the figure to keep under.
How many EV chargers does a car park need?
For new non-residential buildings with more than 10 spaces, Approved Document S requires at least one charge point and cable routes to a fifth of the other spaces. Existing car parks are different. Chargers must be at least 7 kW Mode 3. Check the current rules for your case.
What size are the solar panels?
Our sample uses a 72-cell module, 2278 by 1134 mm and 30 deep, 580 Wp and 31 kg. Other modules differ by a few millimetres, which is enough to move the clamp lines and every rafter, so the module is fixed before the steel is drawn.
Who designs the electrical side?
Not us. We draw the steel, the foundations, the module layout and where chargers and cable routes go. The electrical designer sizes the cables, the inverter and the grid connection, and your engineer designs the structure. The drawings keep the two in step.
Other canopies, pergolas and carports

Door canopy
A small steel canopy over a front or back door, wall fixed or on posts.
From £249design pack

Steel pergola
A steel pergola over a terrace, open or with a roof.
From £249design pack

Carport
A steel carport for one or two cars, with a roof that falls to a gutter.
From £249design pack

Walkway canopy
Steel canopies over walkways, entrances and concourses.
Trade from £295approval set, fixed price
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.