Basket07399 358543

Farms and yards/Farm buildings/Livestock shed

Livestock shed

A steel portal frame shed for cattle: open or ventilated sides, a feed passage, and gates and barriers set out to the bays.

Livestock shed

3D modelFrom sample project RANGE, rendered from the model.

What it is

A livestock shed needs air through it more than anything: space boarding or ventilated sheets on the sides, an open or protected ridge, and the frame set out so the pens, passages and gates fit the bays.

The pack takes it from the pads to the last sheet, with the order list for the steel supplier.

Sizes and options

As we draw it. Every size is set to your job.

The model with its sizes
3D with measuresThe sizes are the model’s own
FrameSteel portal, regular bays
WallsConcrete panels and space boarding
RoofSheets in courses, roof lights between eaves and ridge

Worth knowing

No livestock building within 400 m of a neighbour.

Under agricultural permitted development, a building for livestock cannot go within 400 m of the curtilage of a protected building, broadly a house not on the farm.

Source: The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 6, Class A

The detail

How it is made, fitted and priced, and what to tell us.

Our standard cattle shed is 30.5 x 12.2 m on 6.1 m bays, 4.57 m to the eaves, with a 15 degree roof. The front is open under a 1.37 m cantilever, so the feed passage stays dry while the animals eat. The rear and both gables are boarded: 145 x 22 boards with 25 mm gaps, standing on 2 m concrete panels. The gaps and the open ridge do the ventilating, so we draw the ridge open and keep the roof lights to every fourth course of sheets.

The feed barrier is part of the steel drawing. Ours is a 60.3 CHS top rail at 1250 high, 33.7 CHS bars leaning 20 degrees at 650 centres, on a 250 x 300 kerb. Neck rails, yokes and troughs come from your livestock supplier, so we draw the posts and kerb to take their fixings and leave their parts as outlines. Gates and passages are set to the bay lines, so a column never lands in a gateway.

Most trouble on site comes from the floor, not the frame. The pads and the concrete panels are set out to grid lines from one datum, and the sheet lengths are cut to a 3050 maximum in courses, so the roofer is not cutting at the ridge. If the ground falls across the shed, tell us before we draw: the fall changes how deep the panels sit at each pad.

What moves the price is length (every extra bay adds two columns, two rafters, purlins and a pad), eaves height, and the roof sheet. Fibre cement is our default; box profile is the alternative. Slurry storage, drainage and the feed system are outside our pack. Send us the herd type and numbers, how you feed, where the gates and passages go, the fall of the ground and the distance to the nearest house. The guide to measuring a site for a farm building shows what to send.

More views

Renders and sheets from our sample projects: made-up jobs, modelled and drawn the way a real one is.

Livestock shed - view 1, rendered from the 3D model
3D renderSample project RANGE
MF01-FB-14 Typical frame section
MF01-FB-14Typical frame section
MF01-FB-10 GA plan and foundations
MF01-FB-10GA plan and foundations

Is it right for you?

Good for

  • Beef and dairy cattle
  • Youngstock

Not for

  • Slurry stores, drainage design or feed systems: those are for your specialist
  • Hobby or horse keeping, which usually needs full planning

What the drawings show

  • Pads and columns set out to grid lines from one datum, with the fall of the ground
  • Feed barrier posts, bars and kerb at 650 centres, drawn to the supplier's fixings
  • Boarding and concrete panel heights on the rear and gables, with the 25 mm gaps
  • Roof sheets in courses to 3050 maximum, with the roof lights marked
  • Gate and sliding door positions tied to the bay lines

Questions

Guide: Farm buildings: planning and building regsGuide: How to measure for a farm building

How far must a cattle shed be from a house?

Under agricultural permitted development, a building for livestock cannot be within 400 metres of the curtilage of a protected building. A protected building is a permanent building normally occupied by people, not one on your own farm unit. Closer than that, you need full planning permission (GPDO 2015, Schedule 2, Part 6, Class A, paragraphs A.1 and D.1).

Does a livestock shed need Building Regulations approval?

Often not. Building Regulations Schedule 2, Class 3 exempts a building used for agriculture, or principally for keeping animals, if no part is a dwelling, it is at least one and a half times its height from sleeping accommodation, and a fire exit is within 30 metres of any point. It must still stand up, so use an engineer.

How big is your standard livestock shed?

30.5 x 12.2 m, on 6.1 m bays, 4.57 m to the eaves, with an open front under a 1.37 m cantilever. That is the starting point. We change length, span, eaves and bay to suit your herd and the pens, and the pack covers farm buildings up to 18 x 36 m.

Is there a size limit on livestock buildings under permitted development?

Yes. Class A does not allow works or structures for accommodating livestock covering more than 1,000 square metres, and the total ground area of buildings built under Class A is capped at 1,500 square metres. Larger needs planning permission. Check the current limits with your planning authority before you build.

Your livestock shed, drawn from a real 3D model.

Farm building design pack: from £695

Back in 5 working days or your money back. Or call 07399 358543 to ask first.