Basket07399 358543

Guides/How to make a steel garden gate that hangs true

How to make a steel garden gate

A garden gate fails at the hinge post long before the leaf wears out: the post leans, the gate drops and the latch stops meeting. Build the post and footing right and set the gaps before the concrete goes in, and a steel gate hangs true for decades. This is how our plan does it, and the rules on height and which way it opens.

How to make a steel garden gate

Height first: the planning limits

In England a new gate is usually permitted development, within limits. Next to a highway used by vehicles, a gate, fence or wall over 1 m high needs planning permission; elsewhere the limit is 2 m (the General Permitted Development Order, Schedule 2, Part 2, Class A). Our plan comes 900, 1200 or 1800 mm high: the low gate's leaf sits under the 1 m limit by a road, though its posts count too, so keep them under 1 m as well; the tall one is for a side passage or back garden.

A gate onto a road or pavement must not open outwards over it (Highways Act 1980, section 153). Hang it to swing into your garden. Our driveway gate rules guide covers both in more detail.

Our garden gate plan: the three sizes
SizeOpening between postsLeaf heightLeaf weightHinge postFootings
Low900 mm900 mm20 kgSHS 60 x 60 x 3300 x 300 x 650 deep
Standard1000 mm1200 mm28 kgSHS 60 x 60 x 3300 x 300 x 650 deep
Tall1000 mm1800 mm41 kgSHS 80 x 80 x 3300 x 300 x 650 deep

Swipe the table sideways to see every column.

The leaf: frame, bars and gaps

The leaf is a mitred SHS 40 x 40 x 3 frame with square bars between the top and bottom rails. Lay the four mitred pieces flat, clamp, check both diagonals within 2 mm, tack, check again, then weld. Mark the bar centres on both rails together so they match, and weld the bars alternating ends so the leaf does not bow.

We keep the bars under 100 mm clear, 95 mm on the standard gate. That is the figure Approved Document K uses for guarding where small children may be: a garden gate is not guarding, but children's heads are the same size either way.

The leaf stands 50 mm off the ground so it clears paving and frost heave, with gaps either side as the plan draws them: 30 mm at one side and 15 mm at the other. Set those gaps with packing before the post concrete goes in, not after.

Posts, footings and hinges

The hinge post does all the work. On the standard gate it is SHS 60 x 60 x 3 and the tall gate goes to SHS 80 x 80 x 3. We check it with the leaf's own weight plus 0.5 kN hanging on the free end, someone leaning or swinging on it: the standard gate's top hinge moves 4.7 mm against a limit of 7.0.

Each post goes into a hole in firm ground: 300 mm square and 650 mm deep with post mix for the low gate, and 400 mm square and 700 mm deep with concrete for the standard and tall gates, which are wider and heavier. Stand both posts in, hang the leaf, pack it to height and gap, plumb both posts both ways and brace them, then fill. Leave it 24 hours before you take the packing out.

Use weld-on adjustable hinges, M16, rated 100 kg a pair or more. The plan's check puts the standard leaf at 79 kg down on the pair with the 0.5 kN on its end, and the tall leaf at 92 kg, so do not go lighter. Our gate weight calculator works out the pull on the hinges of your own design. Finish with a gravity latch on the closing post so the gate latches itself as it swings shut.

Galvanise before you hang it

Hot-dip galvanise and powder coat for the longest life outside, or a zinc-rich primer and two coats. Every hollow needs vent holes for the zinc to flow in and drain out; size them to the galvaniser's table (one 14 mm hole each end of an SHS 40, 20 mm on an SHS 60) and talk to them first. Galvanise before hanging if you can, and touch up welds after.

Wider openings and motors

For a drive, a pair of leaves halves the load on each hinge post: our manual double gates plan covers it. Do not motorise a garden gate built for hand use. An automated gate is a machine with its own force limits, safety devices and paperwork; our motorised-ready driveway gate plan is drawn for that, with the operator fitted and force tested by a competent installer.

The build, step by step

The order we build it in. The plan draws each step with its new parts in orange.

  1. Cut and prepare

    Cut the bars: the leaf frame mitred at 45 degrees, bars and posts square. Mark the bar centres on both rails together.

  2. Leaf frame

    Clamp the mitred pieces flat, diagonals within 2 mm, tack, check, weld.

  3. Bars

    Stand each bar on its marks, square, tack top and bottom, then weld alternating ends.

  4. Posts

    Cap the posts and weld the hinge eyes to the hinge post; the hinge pins go on the leaf's stile, square to it.

  5. Hang it

    Dig two holes 300 square and 650 deep, stand the posts in, hang and pack the leaf, plumb and brace, fill with post mix.

  6. Latch and finish

    After 24 hours remove the packing and fit the gravity latch so it drops in as the gate closes.

The plan

Each plan comes in 3 sizes, drawn from a checked 3D model: the steel to buy, the cutting list, every part drawn, the build step by step and a DXF for every plate, and the loads it was checked for.

Building more than one? Every gate plan is in the gate bundle for £12 (4 plans, every size); any 3 plans are £12.

Questions

How high can a garden gate be without planning permission?

In England, 1 m next to a highway used by vehicles and 2 m elsewhere, under the General Permitted Development Order, Schedule 2, Part 2, Class A. Listed buildings and conservation areas can differ.

Which way should a gate open?

Into your property if it opens onto a road or pavement: section 153 of the Highways Act 1980 says such gates must not open outwards.

How deep should gate posts go?

300 mm square and 650 mm deep with post mix for the low gate; 400 mm square and 700 mm deep with concrete for the 1 m wide standard and tall gates (see the post hole calculator). Soft or made ground needs more; ask locally.

What size hinges for a steel gate?

Rated for the leaf with a person on its end. Ours are weld-on adjustable M16 hinges rated 100 kg a pair or more; the tall leaf puts 92 kg on them in our check.

Why does my gate drop?

Almost always the hinge post leaning in its footing, not the leaf. A stiffer post, a proper footing and packing it true before the concrete sets cures it.

Can I add a motor later?

Not to a gate built for hand use. An automated gate needs its own design, safety edges, photocells and a force test by a competent installer.

Sources

Read on the published page. The plan figures are our own, taken off the checked 3D model. Where the law is quoted it is the law in England unless it says otherwise; your engineer, insurer or competent person decides your build.

  1. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 2, Class A, A.1(a)(ii)“in any other case, 1 metre above ground level”
  2. The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 2, Class A, A.1(b)“would exceed 2 metres above ground level”
  3. Highways Act 1980, section 153, s.153(1)“shall be so put up as not to open outwards”
  4. Approved Document K: Protection from falling, collision and impact, 2013 edition (England), para 3.3a, p.24“ensure that a 100mm sphere cannot pass through any openings in the guarding”
  5. Galvanizers Association, Design for Galvanizing poster (reproduces EN ISO 14713-2:2020), Table 1, vent hole sizes for hollow sections“molten zinc must be able to flow freely over all surfaces of a fabrication”