Catwalk, platform and hop-over drawings
Handrail-truss catwalks, platforms and hop-over stairs over pipe tracks: mesh floors, guarding both sides, every connection drawn.

3D modelFrom sample project HF08, rendered from the model.
What it is
A catwalk is a walkway between two supports whose sides are trusses: the top chords are the handrails and the bottom chords carry the floor. It spans between silo tops, plant towers or buildings. A hop-over is a platform on legs with a stair at each end that takes people over pipes, ducts or trays.
Both have open mesh floors, guarding on both sides with a knee rail and toe plate, and ends that bolt to the supports. We draw them from the layout, model every member and plate, and check the guarding heights and gaps.
Sizes and options
As we draw it. Every size is set to your job.
| Catwalk width | 900 mm between trusses |
| Top chord | CHS 60.3 x 5, handrail height 1080 to its centre |
| Panels | 1500 mm maximum, with SHS 60 verticals |
| Floor | 30 mm open mesh on EA floor beams, 100 mm toe plate |
| Hop-over | PFC 150 frame on SHS 100 legs, guard 1100, stair pitch to 42 degrees |
Worth knowing
Guarding at work: 950 mm top rail, 470 mm gaps.
The Work at Height Regulations ask for a top guard-rail at least 950 mm above the edge, with no gap between rails over 470 mm. Standards for fixed platforms and many clients ask for 1100 mm, which is our default.
Source: Work at Height Regulations 2005 (SI 2005/735), Schedule 2 para 3, as made
The detail
How it is made, fitted and priced, and what to tell us.
A catwalk is shop-assembled in sections and lifted in. Each side truss is a CHS top chord, an angle bottom chord, SHS verticals at the panel points and angle diagonals, with a knee rail in each panel. Floor beams cross at each panel point on the bottom chords, and the mesh panels sit on them. At the ends a thin packing plate fills the gap to the support and two bolts go through the support's web. Slopes are common between a silo peak and a tower, so the deck is set out on the slope and the guarding stays square to the walkway.
A hop-over goes up differently. The platform frame is a perimeter of channels, the legs stand on base plates with resin anchors, and the stair on a channel stringer drops to level feet. The platform clears the highest pipe by 150 mm and runs 350 mm past the outer edges so the legs stand clear. Roof versions need the roofer to flash round the legs, which we mark on the drawing.
Site problems are usually gaps and heights. Guarding is checked for the top rail height, the knee rail gap and the toe plate. On stairs, the rails rake at the stair height over the nosing line and run on until they meet the platform's guard height.
Tell us the supports at each end with levels and what each is made of, the walkway width you need, the loads (from your engineer), any pipes or ducts to cross with their sizes and insulation, and the finish. For roof work tell us the build-up so the legs and plates can be set out through it.
Is it right for you?
Good for
- Silo tops and plant towers
- Crossovers above pipe tracks
- Roof plant platforms
Not for
- Fixed ladders and cages: not in this type yet, ask us
- Member sizes and loads: your engineer's
What the drawings show
- A layout in plan and elevation with levels, spans and the supports each end
- Side and end elevations of the truss, with panel points and member marks
- The end connections to the supports, plates and bolts at 1:5
- The guarding: heights, knee rail, toe plate, gaps and post spacing
- A member and plate schedule, cut lists and fixings
Questions
How high should a catwalk handrail be?
The Work at Height Regulations ask for at least 950 mm to the top guard-rail. Platform standards and many clients ask for 1100 mm, and we draw 1100 mm unless told otherwise. We check the heights on every run. The height is measured from the walking surface to the top of the rail, and on a stair it is measured above the nosing line.
How big can the gaps in the guarding be?
The Work at Height Regulations set a gap limit of 470 mm between guard-rails or other protection. Our guarding has a top rail, a knee rail and a toe plate, and the gaps between them are checked against the limit you give us. We draw a knee rail and toe plate in each panel so the openings are small, and the model reports each gap so a long run is not left to a spot check.
How wide should a catwalk be?
BS EN ISO 14122-2 is usually quoted at 800 mm clear, with more where people pass. We default to 900 mm between the trusses and draw whatever width your engineer and client set. Wider catwalks need heavier members, so the width is set early, before the supports are fixed.
How far can a handrail-truss catwalk span?
Makers quote spans up to about 17 m for this type, but the size of the members is the engineer's call. We draw the layout and the members they give us. Longer spans need deeper trusses or an intermediate support, which is a design decision for the engineer and the client.
What is a hop-over stair?
A platform on legs with a stair at each end, used to cross a pipe, duct or cable tray without climbing over it. It has guarding on both sides and open treads, and is anchored to the ground or roof. It is drawn with its stair, platform, legs and base plates, and the roof or slab build-up is shown where the legs stand.
Other structural steelwork

Portal frame buildings
Portal frame warehouses and sheds: frames, bracing, purlins, cladding and docks.
Trade from £895portal frame building, fixed price

Footbridges
Truss footbridges over railways and roads, with their approaches.
Trade from £895portal frame building, fixed price

Load plans
Every wagon of steel planned: what goes on, in what order, and how it is secured.
Trade from £895portal frame building, fixed price

Erection and lift plans
Erection stages and lift plans with sling legs, loads and hook heights.
Trade from £895portal frame building, fixed price

Mezzanine floors
Steel mezzanine floors inside sheds and warehouses: columns, beams, deck, stairs and guarding.
Trade from £895portal frame building, fixed price
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.