Basket07399 358543

Trade/Structural steelwork/Mezzanine floors

Mezzanine floor drawings

Steel mezzanine floors inside warehouses and sheds: columns, beams, composite deck, stairs and guarding, drawn with the building around them.

Mezzanine floor drawings

3D modelFrom sample project U7, rendered from the model.

What it is

A mezzanine is a second floor built inside a building. The frame is columns on base plates, main beams and secondary beams, with a deck on top: composite steel deck and concrete on our sample. The edges are guarded and the way up is a stair, with a gate where pallets go on and off.

We model the mezzanine inside the shed so it clears the shed's own columns, bracing and doors. The steel is drawn from your engineer's design, with every connection from our library.

Sizes and options

As we draw it. Every size is set to your job.

Bays7500 mm both ways on our sample
Deck level4500 mm, with a ComFlor 60 deck and 130 mm slab
ColumnsUC 203 x 203 x 60 on pinned bases, 4 No M20
BeamsUB 457 x 191 x 67 main, UB 305 x 165 x 40 secondary
Guarding1100 mm, CHS 48.3 posts at 1800 mm maximum, knee rail, 150 mm kick plate
Pallet gate1500 mm clear, 1100 mm high

Worth knowing

Warehouse floor edges are guarded at 1100 mm.

Approved Document K sets the barrier height for landings and the edges of floors in factories and warehouses with light traffic at 1100 mm. Stairs and ramps in those buildings are 900 mm.

Source: Approved Document K (2013), Diagram 3.1 Guarding design

The detail

How it is made, fitted and priced, and what to tell us.

A mezzanine goes in after the shed is weather-tight and the slab is down. The columns stand on base plates with resin or cast-in anchors, so the first drawing is the slab: where the column bases land, whether the slab is thick enough to take them, and where the shed's own columns and braced bays are. A mezzanine we draw inside a portal frame is positioned against the frame's grid so it never fouls a rafter, a column or a bracing rod.

The deck decides the beam depth. Composite deck spans between secondary beams and the slab is poured on it, so the beams and the deck are drawn together, with the stud positions and the edge trim. Beams connect by bolted plates, which are all in our connection library and checked for bolts through matching holes. Headroom under the beams is checked to the finished floor, because forklift traffic below is the usual constraint.

Stairs follow the Approved Document for the building type. For industrial stairs Approved Document K refers to BS 5395-3, and we check the rise, going, pitch and handrail heights on the model. The pallet gate bay is drawn open at the front with a bought-in gate across it, and the guarding is continuous either side.

Price follows the tonnage and the number of beam-to-column connections. Tell us the building's layout and slab details, the floor loading from your engineer, the headroom needed below, where the stair goes, and where pallets load. If the floor needs fire protection, say so early, because it changes the finish and the connection detail. Check the access first: a mezzanine in a working warehouse is often built in sections, and the order of erection depends on where the forklifts and the stock can be moved.

More views

Renders and sheets from our sample projects: made-up jobs, modelled and drawn the way a real one is.

Mezzanine floors - view 1, rendered from the 3D model
3D renderSample project U7

Is it right for you?

Good for

  • Warehouses and distribution centres
  • Workshops that need storage above
  • Plant platforms inside buildings

Not for

  • Choosing the imposed load or the fire strategy: your engineer and fire consultant do
  • Retail or assembly floors with different guarding rules

What the drawings show

  • A GA plan with grids, columns, beams and marks, set out to the building's own grid
  • Elevations and sections through the mezzanine with the slab, deck and headroom
  • Base plate and anchor set-out, with a schedule of bases
  • Connection details for beams and columns, with bolt and weld schedules
  • Stair and guarding drawings, with the pallet gate, and cut lists and plate DXFs

Questions

How high does guarding on a mezzanine need to be?

Approved Document K gives 1100 mm for landings and the edges of floors in warehouses and factories with light traffic, and 900 mm for stairs and ramps there. Other building types have different heights, so we draw to the use of your building.

How big a mezzanine can I build?

That depends on the floor loading, the slab and the fire strategy, which your engineer sets. Our sample is a 4 x 2 bay mezzanine at 7500 mm bays, 30 x 15 m, but size is decided by what the building and the engineer allow.

Can a mezzanine fix to the building frame?

Usually it stands on its own columns, not on the shed's frame, which is designed for roof loads. We draw it clear of the frame and note any bracing or column it must avoid. That keeps the mezzanine's loads out of the shed frame and makes it easy to alter the shed later without touching the floor.

What deck goes on a mezzanine?

Our sample uses composite steel deck with a concrete slab, supported on secondary beams. Other floor types exist, and we draw whichever your engineer specifies. The deck decides the beam spacing, so the deck type is fixed before the beams are drawn, and the engineer confirms it.

Do I need stairs and a gate?

You need a way up and a way to move goods. The stair is drawn to the Approved Document for the building type, and a pallet gate across a loading bay keeps the edge guarded when it is shut. The stair and gate positions are set early because they decide where the guarding must stop and where headroom is needed.

Send the drawings.

Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).

Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.

Big files: paste a WeTransfer, Dropbox or Google Drive link, or send them when we reply.

Thanks, that’s with us.

We use your details only to answer you: privacy, terms.