Trade/Structural steelwork/Footbridges
Footbridge drawings
Steel truss footbridges over railways and roads, with their ramps, stairs and lifts, from the approval set to the transport segments and the span lift.

3D modelFrom sample project TP03, rendered from the model.
What it is
A footbridge is a span, its parapets and its approaches. We model the truss, the deck and the cross girders, split the span into segments that can travel, and draw the splices, the bearings and the lift.
Our sample is a 40 m half-through Warren truss over a three-track railway, in three transport segments, with a ramp and stair one end and a lift and stair the other.
Sizes and options
As we draw it. Every size is set to your job.
| Sample | 40 m span, 39.6 t, three segments |
| Truss | Half-through Warren, SHS and RHS chords |
| Parapet | 1.8 m solid over the railway |
Worth knowing
Over a railway, the parapet is 1.8 m and solid.
A footbridge parapet away from a railway is 1150 mm high. Over a railway it is 1800 mm, solid to the full height with a smooth inner face.
Source: DMRB CD 377 Revision 4, Table 8.6 and clause 8.9
The detail
How it is made, fitted and priced, and what to tell us.
The span is the part people see; the lift is what the drawings plan for. Our 40 m sample is a half-through Warren truss, 12 bays, with the chords cambered 60 mm and split into three transport segments, each 13.6 m long and 3.45 m wide, 39.6 t in all. The segments join at the chords on bolted end plates, M24 grade 10.9. Splices are placed by what a lorry can carry and what a crane can pick, not just by the structure.
Camber is the number most often misunderstood. SCI guidance points out that designers often mean the shape needed once loaded, and fabricators mean the shape to cut so it ends up right, with shrinkage allowed. We state on the drawing exactly what the figure covers, and draw the shop-assembled shape and the final shape as separate things. Where the contract asks for a trial erection, we draw the shop assembly with every piece marked, so each bolt hole is proved with a bolt of the site size before the span leaves the yard.
Gaps at the truss nodes matter in hollow sections. We keep the web-to-web gap at 60 mm in the sample, above the 50 mm minimum the joint rule gives for this geometry, and check it on every build. The deck is 8 mm plate on longitudinal stiffeners, with the cross girders under the bottom chords. Over an electrified railway there are extra rules in Network Rail's manual: no open risers, no perforated deck, and drainage that does not run off onto the track or the overhead line. Parapets run at least 3 m beyond any uninsulated overhead equipment, as Network Rail's standard asks.
Price follows the span, the number of segments, the approaches (ramps, stairs, lifts) and the parapet. Solid screens over a railway cost far more than open bars. The railway owner approves the design and sets the possession, so the lift date is theirs. Tell us who owns the line, the span and clearances your engineer has set, the access for the crane and the transport route.
Is it right for you?
Good for
- Rail and road crossings
- Parks and campuses
Not for
- Designing the bridge: your engineer does that, and the railway owner approves it
- Bridges carrying vehicles
What the drawings show
- Truss set-out with camber and a schedule of nodes and gaps
- Each transport segment with piece marks, parts list and weight
- Splices, bearings and the fixed / guided articulation
- Plates one thickness at a time, with DXFs and weld / NDT schedule
- Trial erection, transport and the span lift with an end view
Questions
How much headroom does a footbridge need on the deck?
CD 353 Table 5.6 gives the clear height from the footway to any overhead obstacle, between the handrails: 2.3 m for pedestrians only and 2.4 m where cyclists use it. Headroom over a railway or a road below is a separate figure, agreed with the railway owner or set by CD 127.
Why are footbridges delivered in segments?
Road transport limits the size. Our 40 m sample goes in three segments about 13.6 m long and 3.45 m wide, joined by bolted end plates at the chords, or welded in a jig beside the site. The lift is then a single pick. Segment sizes depend on your route.
What is camber on a footbridge?
An upward curve built into the steel so that once the dead load is on, the deck sits at the right profile. Ours is 60 mm in the sample. The drawing must say whether the figure includes fabrication allowances, because the designer and the fabricator often count different things.
Who approves a footbridge over a railway?
The railway owner. For Network Rail, clearances and structure details are agreed with its engineers, and the design follows its standard NR/L3/CIV/020. The engineer handles that process. Our drawings follow the agreed design and present it for the approval pack and the fabricator.
Other structural steelwork

Portal frame buildings
Portal frame warehouses and sheds: frames, bracing, purlins, cladding and docks.
Trade from £895portal frame building, fixed price

Load plans
Every wagon of steel planned: what goes on, in what order, and how it is secured.
Trade from £895portal frame building, fixed price

Erection and lift plans
Erection stages and lift plans with sling legs, loads and hook heights.
Trade from £895portal frame building, fixed price

Catwalks and platforms
Handrail-truss catwalks, peak platforms and hop-over stairs over pipework.
Trade from £895portal frame building, fixed price

Mezzanine floors
Steel mezzanine floors inside sheds and warehouses: columns, beams, deck, stairs and guarding.
Trade from £895portal frame building, fixed price
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.