Trade/Folded aluminium/Pressed cills
Pressed aluminium cill drawings
Pressed aluminium cills under windows and doors: a fall outward, a front leg with a drip, and stop ends welded up at each end.

3D modelRendered from the model we draw from.
What it is
A cill throws the water off the window and clear of the wall below. It falls outward, turns down at the front with a drip, and stops at each end with an upturned stop end so water cannot run round into the wall.
Each cill is drawn to its opening, flat, with its folds.
Sizes and options
As we draw it. Every size is set to your job.
| Fall | 5° outward on our sample |
| Front leg | 70 mm with a drip |
| Ends | Welded upturned stop ends |
Worth knowing
Fix a cill once, then let it float.
The metal-fabrication guide asks for one fixed point on each length of aluminium, with every other fixing allowed to move. A cill screwed down tight along its length will buckle and split at the joints.
Source: MCRMA GD26, Aluminium fabrications: a guide to good practice (2020), 3.3.3.1 Fixed point
The detail
How it is made, fitted and priced, and what to tell us.
A pressed cill is one sheet folded to a section: a back upstand under the window frame, a sloping top, a front leg that drips clear of the wall, and welded stop ends. The sheet is 2 mm, which suits an unstiffened width of 275 to 550 mm. Wider than that and the face needs stiffening or thicker sheet, so a deep cill under a big window is a different job from a standard one.
The projection is what keeps the wall clean. The front leg stands clear of the finished face so water drips free: we draw it 30 mm off the finish, 40 mm on render, with a 70 mm front leg. The top falls at 5 degrees as a minimum after installation. The cill is not screwed down through its top. It sits on clips or supports 100 mm wide at about 600 mm centres, with two under each window as a minimum, so there are no screw heads in the water path.
Cills come in 3 m lengths and a long window run needs joints. A joint is a loose union with a gap for movement, never a tight butt, and each length has one fixed point. The stop end is welded and turns up so water cannot run round into the reveal. The joint at each end against the reveal is dimensioned at 8 mm minimum, and where the cill meets the reveal the sealant should be a sprayable type with no silicone.
What goes wrong on site is almost always the opening: out of square, or deeper than the cill was made for. We draw each cill to the opening as surveyed, with the reveal depth and the frame position, and flag any opening where the packer needed is more than the cill's clearance allows.
Price rises with the number of different openings, with welded corners and with width. Tell us the opening sizes, the reveal depth, the wall finish (brick or render) and the window maker's cill detail if they have one.
More views
Renders and sheets from our sample projects: made-up jobs, modelled and drawn the way a real one is.

Is it right for you?
Good for
- Windows and doors in cladding and brick
Not for
- Extruded cills with maker end caps: the window maker supplies those
- Stone or brick-on-edge sills
What the drawings show
- A cill plan or elevation with every opening and cill length marked
- A section through the cill, window frame and wall: projection, fall, front leg and drip, dimensioned
- A flat pattern per cill with folds and stop-end blanks, with a DXF
- Clip or support positions and the joint gaps between lengths
- A schedule of cills by mark, quantity and length
Questions
What fall should a window cill have?
Makers of metal cills ask for a minimum fall of 5 or 8 degrees after installation. We draw 5 degrees on the standard pressed cill and 8 degrees on cappings, so rain runs off the face rather than sitting on it. Both figures are minimums after installation, so we draw a little over where the window allows.
How far should a cill project from the wall?
Enough to drip clear of the finished face. In our rule table a brick sill stands about 25 mm past the wall with a drip about 10 mm beyond, and render needs about 40 mm. Our standard pressed cill stands 30 mm off the finish, with a 70 mm front leg.
Why does a cill have stop ends?
The end of a cill is where water escapes sideways into the reveal. A stop end is an upturned, welded return at each end that holds the water on the cill until it falls off the front. We weld them rather than rely on sealant.
Can a pressed cill be longer than 3 m?
Cills are folded in 3 m lengths and joined with a loose union, because aluminium moves and one long length buckles. A gap of a few millimetres is left at each union. Longer single lengths are possible but only in light colours, and need bigger gaps.
When do you use a pressed cill rather than an extruded one?
Extruded cills come in set projections with matching end caps from the window maker. A pressed cill is made to any size and shape, so we draw one when the opening, the wall build-up or the projection is non-standard. Either way the cill is drawn to the opening as surveyed.
Other folded aluminium

Copings
Folded aluminium copings over parapets, with corner and apex fittings.
Trade from £295approval set, fixed price

Cappings
Aluminium cappings over walls, steel edges and balcony frames.
Trade from £295approval set, fixed price

Fascias and soffits
Balcony fascias and soffits that fall to a drip and drain.
Trade from £295approval set, fixed price

Rainscreen cassettes
Aluminium rainscreen cassettes on rails, on their tested edges.
Trade from £295approval set, fixed price

Flashings and surrounds
Drip, head and abutment flashings, and window surrounds.
Trade from £295approval set, fixed price

Roof cowls
Folded aluminium cowls over roof upstands and riser openings, made and fitted from a survey.
Trade from £295approval set, fixed price
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.