Basket07399 358543

Trade/Folded aluminium/Roof cowls

Roof cowl drawings

Aluminium cowls over roof upstands and riser openings, drawn from a site survey, with the board, membrane, capping tray and services outlet.

Roof cowl drawings

3D modelRendered from the model we draw from.

What it is

A cowl covers the top of a roof upstand where a riser or a plant opening comes through the roof. Services come out of a cut-out in one wall, and the cowl covers the cut-out. It is made of 2 mm aluminium sheet, powder coated, folded and welded to the outline of the upstand as measured on site.

Under the metal there is a fire-rated board cut to the wall tops, with a membrane over it. The metal capping tray sheds water to the outer faces; a one-fold overhang hoods the services outlet.

Sizes and options

As we draw it. Every size is set to your job.

Sheet2 mm EN AW-5005 H14, powder coated
Capping fall1 in 20
BoardObex 12.5 mm on the wall tops only
OutletCut-out starting 150 mm above the waterproofing
FixingsScrews at 400 mm centres, visible

The detail

How it is made, fitted and priced, and what to tell us.

Every cowl is different because every upstand is. We draw from a survey sheet: the outline of the upstand's outer face, the wall thicknesses, the riser opening in plan, which wall the services leave through, and the height of the waterproofing. The cowl sits straight on the existing walls, so a few millimetres of error on the survey becomes a gap or a clash at the lid. We note on the drawing what site must check before the metal is made.

Build-up sets the order of work on site. The board is laid flat on the wall tops, cut to suit each wall, screwed into the concrete, with the riser void left open. The membrane is bonded flat over the board strips and dressed down the outer faces. Then the capping tray goes on, welded at the corners, with drips that lap 50 mm down the walls, and screwed through into the upstand. On a stepped upstand each depth gets its own tray, with the front tray lapping over the one behind it like a roof lap, sealed.

The services outlet is the detail that goes wrong most. We cut the outlet into one wall with its bottom edge 150 mm above the waterproofing, the minimum we work to, and put a folded front angle across the cut-out for the metal cowl to fix to, screwed down at each end. The outlet side can change on site, and we say so on the drawing so a change is noted before the metal is cut.

Price follows the number of unique sizes and the number of steps and corners, not the area. Tell us the upstand outline and heights, which wall the services leave through, the riser opening size, the existing waterproofing and who supplies the membrane, and the colour. Photographs of each upstand with a tape in them help.

Is it right for you?

Good for

  • Riser openings and plant penetrations through a flat roof
  • Existing upstands that need capping
  • Stepped and irregular upstands

Not for

  • Pitched roofs: vents there use pipe flashings
  • Certified smoke or flue terminals: the maker's product governs

What the drawings show

  • A plan of each cowl: upstand outline, riser void, cut-out and tray joints, dimensioned from the survey
  • A true section through the wall, board, membrane, capping and cowl overhang
  • Make-and-fit steps in 3D: board, membrane, tray, closers, cowl
  • A flat pattern per folded part and a DXF, with a parts and fixings list
  • A site check list for the surveyor, one line per assumption

Questions

What is a roof cowl?

A metal cover over the top of an upstand where services or a riser come through a flat roof. It sheds water away from the opening and has a hood over the outlet for the pipes or cables. Aluminium is used because it can be folded to the upstand outline, welded at the corners and coated to match the other roof metalwork.

Why are cowls drawn from a survey?

Because upstands are rarely square or to the architect's size. Each cowl sits straight on the existing walls and has to cover them, so we draw from the measured outline and flag the dimensions to check before manufacture. Where a survey dimension is uncertain we write it as an assumption on the drawing, so the site check list has one line for each.

What fall does the capping have?

We draw 1 in 20 on the capping tray, high on the services side, so water runs off the outer faces. The overhang over the outlet falls too, so rain does not run back into the opening. A steeper fall is possible, but 1 in 20 is easy to fold and weld and sits comfortably on a flat roof upstand.

Can the services come out of any side?

They can, but the cut-out is in one wall and the cowl is made to match. If the outlet side changes on site, the cowl must change with it, so we mark the assumed side on the drawing for site to confirm.

Who supplies the board and membrane?

That is agreed per job. We draw the build-up, with a fire-rated board on the wall tops and a membrane bonded over it, and the drawing lists who supplies each layer. Whoever supplies a layer, the drawing shows how it laps and where it is fixed, so the roofer and the metal fixer work to the same section.

Send the drawings.

Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).

Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.

Big files: paste a WeTransfer, Dropbox or Google Drive link, or send them when we reply.

Thanks, that’s with us.

We use your details only to answer you: privacy, terms.