Homes and gardens/Stairs/Stair tower
Steel stair tower
A free-standing steel tower of switchback flights for access to silos, plant and roofs, with landings at every level.

3D modelFrom sample project HF08, rendered from the model.
What it is
A stair tower is a braced steel frame with flights between landings, each landing a working level. It is drawn with its foundations, its bracing, the guarding at every level and the lift plan to put it up.
Our sample climbs 24.7 m in nine flights.
Sizes and options
As we draw it. Every size is set to your job.
| Sample | 24.7 m, nine flights |
| Frame | Braced steel columns |
| Guarding | 1100 mm at every landing |
Worth knowing
Access once a month decides stair or ladder.
Approved Document K treats maintenance access by frequency. Access needed a minimum of once a month should follow the stair provisions; less often, it may be appropriate to use portable ladders, with the temporary-access rules in the CDM Regulations for safe use.
The detail
How it is made, fitted and priced, and what to tell us.
The first question for a stair tower is whether it needs to be a stair. Approved Document K says that where a stair or ladder will be used to reach areas for maintenance, access needed at least once a month should follow the provisions for private stairs in dwellings or the industrial stair and ladder standard. Access needed less often than once a month may be done with a portable ladder, and for a silo head that is climbed once a year, that is a cheaper answer. The client decides how often the plant is reached.
Industrial stairs are drawn to the industrial standards, not to the building stair table. Approved Document K points to BS 5395-3 (withdrawn in 2015, still cited) or BS 4211, and machinery access to BS EN ISO 14122. Those standards are paywalled and our research holds them only second-hand, so the sizes on a job drawing come from your engineer's chosen standard, and ours carry a note naming it. We keep landings, handrails and toe plates as that standard sets them.
A tower is a frame that happens to have stairs. Our sample is braced steel columns with a landing at each level and the flights switching back between them; the foundations, bracing, guarding at every level and the lift plan are all drawn. Landings alternate ends so the next flight starts where the last one finished. The bracing leaves the ground storey open as the way in.
Prices depend on height, number of levels, the loads on the landings (plant, people, pipework) and the finish. Hot-dip galvanised is standard for outdoors. Tell us the height, the levels to serve, the loads, the ground conditions and where the tower is relative to the silo or plant. A crane for the lifts is a separate item.
Is it right for you?
Good for
- Industrial sites, silos and plant
- Roof access
Not for
- Roof or plant that is reached less than once a month: a portable ladder may do (Approved Document K 1.42b)
What the drawings show
- General arrangement in plan and elevation with every landing level and flight
- The braced frame, with the foundation bolt positions
- Each landing's guarding, with the exit opening where a catwalk joins
- The lift sequence for the frame and the flights
- Parts, marks and bolt schedules for each level
Questions
Guide: Stair rules in England: rise, going, headroomGuide: How to measure for a balustrade or stair
Do I need a stair or will a ladder do?
Approved Document K says access needed less than once a month may use portable ladders; at least monthly it points to the industrial stair and ladder standards. Silo and plant access is often daily or weekly, so a stair.
What standards apply to industrial stairs?
Approved Document K points to BS 5395-3 (withdrawn in 2015, still cited) or BS 4211, and machinery access follows BS EN ISO 14122. Your engineer chooses the one that applies. Our drawings name it.
How high can a stair tower go?
Our sample climbs 24.7 m in nine flights. The limit is the engineer's: wind, the loads on the landings and the foundation set it, and a taller tower is usually tied to the structure it serves. Tell us the height to the top platform and what it must carry, and we draw to the design you are given.
How is the tower put up?
By crane, in marked pieces, with the bracing going in as the frame rises. The lift plan is on the drawings, with the weight and lift points of each piece. Your erector's method statement governs the order on the day, and the foundation bolts are set out from the same drawings so the base is ready first.
Does it need guarding at every level?
Yes. Our sample has 1100 mm guarding at every landing, with handrail and knee rail both sides of each flight, and toe plates at the landings. The exit where a catwalk joins is left as an opening in the guarding. Your engineer's chosen standard sets the exact rail heights, and we name it on the sheet.
Other stairs

External steel stair
A galvanised steel stair outside: to a flat, a garden, a deck or a podium.
From £395design pack

Feature stair
A steel dog-leg stair in a reception or atrium, with glass balustrade.
From £395design pack

Helical stair
A steel helical stair turning round a void, with stringers cut from flat plate.
Trade from £295approval set, fixed price

Escape stair balustrade
Balustrades and handrails up concrete escape stairs, flight after flight.
From £249design pack
Send the drawings.
Send the drawings and get a fixed price back within 4 working hours (Mon-Fri, 8 am-6 pm).
Not ready to send drawings? Ask for the full sample pack for your type of work, or a call back, with the form.